CDM were appointed by Brendoncare as the principal contractor to deliver a 12 week programme that consisted of a full refurbishment of their current kitchen, all whilst the care home remained operational.
Our works included:
- Principal contractor duties
- Temporary kitchen facilities
- Electrical and Fire Alarm
- Mechanical and Plumbing
- Drylining and grid ceilings
- Wall hygiene panels
- Drainage
- Floor screed
- Non- slip flooring
- Certified fire doors
- Decorations
- Installing of a bespoke stainless steel kitchen