CDM were appointed by Brendoncare as the principal contractor to deliver a 12 week programme that consisted of a full refurbishment of their current kitchen, all whilst the care home remained operational.

Our works included:

  • Principal contractor duties
  • Temporary kitchen facilities
  • Electrical and Fire Alarm
  • Mechanical and Plumbing
  • Drylining and grid ceilings
  • Wall hygiene panels
  • Drainage
  • Floor screed
  • Non- slip flooring
  • Certified fire doors
  • Decorations
  • Installing of a bespoke stainless steel kitchen